Ceiling damage:
3rd floor hallway:
A water soaked electrical panel on the 2nd floor:
1st floor:
1st floor - opening a trench into the sub-basement.
When the contractor cut a gash in this duct work water came pouring out:
2nd floor:
3rd floor:
Lauren's office is going to be pulling double duty as the copy and fax room:
2nd floor:
My assistant, Andie, went through and put together basic office supply packets for everyone who got relocated and had their desks packed up and put in temporary storage:
Tomorrow morning we will open for business as usual. It has been a long 3 days but I'm proud of what we've accomplished.